Procurement Record
Local normalized record from the procurement corpus. External source portals may block direct access; this page preserves the record used by the dashboard.
Procurement Details
- Status
- No
- Value
- $479,682.00
- Category
- Unknown
- Process
- Unknown
- Published
- 2024-07-12
- Closes
- Unknown
- Contract Start
- Unknown
- Contract End
- Unknown
- Last Seen
- 2026-07-02T04:32:20.875Z
Description
B76141 - Carry out asbestos removal and refurbishment works at Innisfail Fire Station. Variation Upgrade of switchboard Variation Lighting Engineer inspection/assessment as per Quote# 231013 Variation 1.0 Variation Additonal costs for Electrical Engineers light upgrade plan as per Quote 231026 Variation Make Safe External staircase as per Quote No: 231114A Variation: 4.0 Variation Reconfigure upstairs toilet/ storeroom as per Quote No: 231114C Variation: 2.0 Variation Supply & install new 3 phase, outlet & cabling for washer & 3 phase safety switch in new switchboard as per Variation 3.0 Item 3.0.4 Variation Top level complete rewire of all lights, fans & power outlets as per Variation 3.0 Item 3.0.8 Variation Relocate data cabling in main engine bay per Variation 3.0 Item 3.0.1 Variation Engineer lighting plan as per Variation 3.0 Item 3.0.2 Variation Sub mains cabling laying across metal ceiling as per Variation 3.0 Item 3.0.3 Variation Supply & install new emergency lighting & wiring as per plan throughout complex as per Variation 3.0 Item 3.0.5 Variation Supply & install new temp lighting in engine bay & disconnect when ready as per Variation 3.0 Item 3.0.6 Variation Supply & install new emergency control in DBB subboard as per Variation 3.0 Item 3.0.7 Variation Price difference to install high bay lights in engine bay one as per Variation 3.0 Item 3.0.9 Variation Supply & install new lights & wiring per plan provided additional 5 lights plus 2 sensors as per Variation 3.0 Item 3.0.10 Variation Relocate data sensor wiring 2 front roller doors as per Variation 3.0 Item 3.0.11 Variation Additional ASM upper level toilet/storeroom as per Variation 005 Variation Emergency exit door upstairs as per Variation 006 Variation Kitchen floor, grind floor of existing topping red oxide, cut out & investigate wet area to determine cause as per Variation 007 Variation Additional diamond grind before applying MR & Vinyl, applying 3 coats of Mapei Plan MR, pply topping to floor and prime floor ready for vinyl
Contact
- Name
- Unknown
- Unknown
- Phone
- Unknown
Source Evidence
- Source System
- QLD Open Data
- Source Notice ID
- 9aa68c1b-10f8-4a26-8e6d-53f2171d9e4f-669
Attachments
No attachments captured for this record.